I do not want two jobs to run at the same time.

Posted: 16 Jul 2008 3:23
by mlvats
I do not want two jobs to run at the same time. These two jobs are in two different group and tables.
How can this be done in Control-M?

Posted: 16 Jul 2008 3:39
by mauriziog
There many ways !

1) Have two different start time from two jobs
execution panel
submit between, to fields

Posted: 16 Jul 2008 4:13
by Lacoochee
You could also make the jobs dependent on the same quantitative resource.

Create a quantitative resource with a max value of one and then in each of the jobs make them dependent on that resource being available.

Hint: In the Control-M/EM GUI select Tools --> Quantitative Resources --> New ... go from there.

Posted: 16 Jul 2008 4:30
by Walty
Why you don't use the Control Resources to serialise your jobs ?

Control Resources indicates the resources required by the job during execution and the type of control (shared or exclusive)

Posted: 16 Jul 2008 11:00
by mlvats
Thanks.everyone for the reply. i used Control Resource Parameters - Exclusive and it did work.

Resource Exclusive or Share

Posted: 22 Jul 2008 1:44
by siipryasa
The name of the resource is the same in the two jobs's you has win upper and lower case,