Control-M v8

Everything about Control-M Server installation or setup.
Post Reply
Admin007

Control-M v8

Post by Admin007 » 04 Mar 2013 4:40

We will be upgrading Control-M for z/OS (v6.3.08) and Control-M for Distributed Systems (AIX - v6.4) to v8 over the next few months.

I am wondering, what issues, if any, people are experiencing or can be expected during and after this upgrade. Also, any helpful hints or tips that can be utilized.

We also use Oracle 11.2 for the database.

User avatar
fyot
Nouveau
Nouveau
Posts: 736
Joined: 26 Apr 2005 12:00
Location: PARIS
Contact:

Post by fyot » 06 Mar 2013 9:46

Hi

Migration tools will provide correct way to migrate data.
But the most important things you need to see is about :

- vocabulary as scheduling table by folder...
- write and upload changed by check in and check out...
- utility's option modified and adapted with new vocabulary,
- and new console including GU, CCM, Desktop, and RF.

Migration will be as easy as previous version, but,
the most important will be to teach all user how to work with the new interface.

Post Reply