Cyclic Jobs. Is there a max run no
Posted: 30 Jan 2019 12:42
I have a job that will need to run every 5 mins almost all day.
Is there a limit to the number of times a job can run without breaking.
If I need to break it up into two or three consecutive jobs, say 200 each, I can do that.
Anyone know for sure?
Is there a limit to the number of times a job can run without breaking.
If I need to break it up into two or three consecutive jobs, say 200 each, I can do that.
Anyone know for sure?