Conditions between Scheduling groups didn't passed... why?
Posted: 14 Mar 2008 8:45
Hello all...
There is something confusing. I have 3 scheduling groups, A --> B --> C
Group B must finish OK and passed it's out conditions to group C.
Group A & C is running every day, five day in week (Monday to Friday).
Group B is running only in Monday.
But, for Tuesdasy, Wednesday and so on, CONTROL-M didn't create missing conditions for group C (conditions from B to C), and operator always must manually add this condition.
In and Out conditions are defined in group definitions.
Adjust conditions parameter is set to Yes, but it is only for jobs inside scheduling groups. How to manage conditions in similar way between scheduling groups? I can't find in documentation.
All 3 Scheduling groups have confirmation parameter set to on.
Environment is CONTROL-M 6.3.01 ENterprise Manager for WIndows and INCONTROL for z/OS 6.2.18
I'm not sure, but I think that I read somewhere about it - if the scheduling groups have confirmation parameter set to on, they can't pass conditions between groups, but I'm not sure about it, and I can't remember where I saw it.
Any help will be appreciated. Tnx.
There is something confusing. I have 3 scheduling groups, A --> B --> C
Group B must finish OK and passed it's out conditions to group C.
Group A & C is running every day, five day in week (Monday to Friday).
Group B is running only in Monday.
But, for Tuesdasy, Wednesday and so on, CONTROL-M didn't create missing conditions for group C (conditions from B to C), and operator always must manually add this condition.
In and Out conditions are defined in group definitions.
Adjust conditions parameter is set to Yes, but it is only for jobs inside scheduling groups. How to manage conditions in similar way between scheduling groups? I can't find in documentation.
All 3 Scheduling groups have confirmation parameter set to on.
Environment is CONTROL-M 6.3.01 ENterprise Manager for WIndows and INCONTROL for z/OS 6.2.18
I'm not sure, but I think that I read somewhere about it - if the scheduling groups have confirmation parameter set to on, they can't pass conditions between groups, but I'm not sure about it, and I can't remember where I saw it.
Any help will be appreciated. Tnx.