2 Groups of Jobs that cannot run at the same time
Posted: 22 Jul 2013 9:13
Problem:
2 Groups of jobs. Each Group has 8 jobs (number of jobs doesn't matter). The jobs inside the group must run in parallel. The two groups can never run at the same time.
They cannot use conditions.
Exclusive resources will not allow the jobs inside the group to run at the same time.
How do we make one group of jobs wait for another group if they are still executing?
2 Groups of jobs. Each Group has 8 jobs (number of jobs doesn't matter). The jobs inside the group must run in parallel. The two groups can never run at the same time.
They cannot use conditions.
Exclusive resources will not allow the jobs inside the group to run at the same time.
How do we make one group of jobs wait for another group if they are still executing?