Problem:
2 Groups of jobs. Each Group has 8 jobs (number of jobs doesn't matter). The jobs inside the group must run in parallel. The two groups can never run at the same time.
They cannot use conditions.
Exclusive resources will not allow the jobs inside the group to run at the same time.
How do we make one group of jobs wait for another group if they are still executing?
2 Groups of Jobs that cannot run at the same time
Correction. You are right, it does exist in V7 FP4. This will absolutely solve the original problem.
When migrating from older versions of Control-M you will need to modify a EM System Parameter called "ControlResourceForSMARTTable" from 0 to 1.
The parameter comes with this disclaimer:
When set to 1, enables definition of Control Resources for SMART and Sub Tables in Control-M Servers from release 7.0.00.200, however Control-M/EM clients of versions lower than 7.0.00.300 , can not login to the Control-M/Enterprise Manager.
When migrating from older versions of Control-M you will need to modify a EM System Parameter called "ControlResourceForSMARTTable" from 0 to 1.
The parameter comes with this disclaimer:
When set to 1, enables definition of Control Resources for SMART and Sub Tables in Control-M Servers from release 7.0.00.200, however Control-M/EM clients of versions lower than 7.0.00.300 , can not login to the Control-M/Enterprise Manager.