Migrating a set of Control-M Jobs from one environment to another
Posted: 11 Oct 2018 5:35
Hello all,
I apologize if this is the wrong venue for this question, but am not sure where else to look. I am a consultant working with a company that has been created through a divestiture of assets. The parent company has a fairly extensive (to me at least) list of Control-M jobs. A fair number of these (1,500+) are desired in the newly formed company. Most of the systems associated with these jobs should be being moved over to NewCo. I'm looking for a resource to talk to about how to accomplish this, and possibly even to contract with to do this work. Can someone point me to some good resources?
Again, I am sorry if this is not the correct forum. Please point me the right way if I am in the wrong place.
Best,
George
I apologize if this is the wrong venue for this question, but am not sure where else to look. I am a consultant working with a company that has been created through a divestiture of assets. The parent company has a fairly extensive (to me at least) list of Control-M jobs. A fair number of these (1,500+) are desired in the newly formed company. Most of the systems associated with these jobs should be being moved over to NewCo. I'm looking for a resource to talk to about how to accomplish this, and possibly even to contract with to do this work. Can someone point me to some good resources?
Again, I am sorry if this is not the correct forum. Please point me the right way if I am in the wrong place.
Best,
George