Control-M Scheduling for Initial and Incremental
Posted: 10 Apr 2015 3:08
Hi, I created batches for building a big data file from data base extracts, that will run either for initial or incremental loading. The final file will be sent to an external application.
For initial load (1st mode), only the initial batches run, while for incremental load (2nd mode), all the batches _initial and incremental_ should run. The final sending batch is the same in every case and should run when all the other batches are ended.
My question is: is there a simple way in Control-M to start that final sending batch only when all batches are finished, be it initial and incremental (2nd mode), or only initial (1st mode)?
Thanks in advance.
For initial load (1st mode), only the initial batches run, while for incremental load (2nd mode), all the batches _initial and incremental_ should run. The final sending batch is the same in every case and should run when all the other batches are ended.
My question is: is there a simple way in Control-M to start that final sending batch only when all batches are finished, be it initial and incremental (2nd mode), or only initial (1st mode)?
Thanks in advance.