quantitative ressources
- philmalmaison
- Nouveau
- Posts: 1148
- Joined: 08 Jun 2007 12:00
- Location: Ile de France
quantitative ressources
HY
do you know if there is a way to have GLOBAL quantitative ressources, working with more than one control-m server like GLOBAL COND.
parameters must be set beetwin the different controlm server
?
thanks for your answer
Philmalmaison
do you know if there is a way to have GLOBAL quantitative ressources, working with more than one control-m server like GLOBAL COND.
parameters must be set beetwin the different controlm server
?
thanks for your answer
Philmalmaison
- philmalmaison
- Nouveau
- Posts: 1148
- Joined: 08 Jun 2007 12:00
- Location: Ile de France
- philmalmaison
- Nouveau
- Posts: 1148
- Joined: 08 Jun 2007 12:00
- Location: Ile de France
The "global resources" is a wish that I have ask to BMC from about one year (I control if I have alredy posted in the forum).
Can be usefull, very usefull.
I have projected to develop something using the controlm resources tables.
My idea was to align the corresponding tables from one CTM-server to the others.
I have tried this solution in the TEST area but never in production because there we have many configurations to change in the job definitions.
Can be usefull, very usefull.
I have projected to develop something using the controlm resources tables.
My idea was to align the corresponding tables from one CTM-server to the others.
I have tried this solution in the TEST area but never in production because there we have many configurations to change in the job definitions.