Post by Gopikkd » 21 Dec 2009 2:03

Hi,

What is the use of Maximum reruns option under the Execution tab in the Job editing form? And what should be the maximum rerun?

User avatar
th_alejandro
Nouveau
Nouveau
Posts: 188
Joined: 26 Nov 2008 12:00
Location: Bogotá

99

Post by th_alejandro » 22 Dec 2009 12:08

99. The input mask in the Control-M editor is ##, so, you can't put a 100 or more. :cry:

This is for Ctm v6.3.01, i don't know if this was corrected in 6.4.

User avatar
brownbag
Nouveau
Nouveau
Posts: 161
Joined: 11 Oct 2007 12:00
Location: Melbourne

MAXIMUM RERUNS

Post by brownbag » 12 Jan 2010 6:53

The value of maximum reruns has two meanings:
(1) If the job is cyclic, it determines the total number of runs of the job (not total RERUNS). The highest value is blank, as this will not limit the number of runs of the job.
(2) If the job is rerun via a DO RERUN in the steps panel of the job, it determines the maximum number of reruns (not the total RUNS). If a job has a DO RERUN in the Steps panel, the ‘Maximum Reruns’ field must have a value, or the job will fail when a rerun is attempted.

This value doesn't affect the ability to do a manual rerun on a job, so it is really only relevant for cyclic jobs or those with a DO RERUN. The value depends on how many times you want to allow reruns.

The dual meaning of this is a bit confusing, but unfortunately we have to put up with it.

User avatar
Gopikkd
Nouveau
Nouveau
Posts: 154
Joined: 25 May 2009 12:00
Location: Bangalore

MaxRerun

Post by Gopikkd » 23 Oct 2011 9:39

Thanks Brownbag for detailed explanation.