Hi, I have Control-M 6.3 on unix (solaris10) i'm trying to get an alert when a group of jobs dont run after 3 days, can i do this with BIM or with other tool?? I need to know if some or all the jobs didn't run and if it's possible to know the reason...
cheers!!
Alert process with BIM
- philmalmaison
- Nouveau
- Posts: 1148
- Joined: 08 Jun 2007 12:00
- Location: Ile de France