Suppose there is a flow of three jobs like 1A-->1B--1C, now i want the below scenario
In a flow if job 1A runs after 8am, it should not run the script: 1B but go directly to his successor (Pass Condition) 1C
please let me know if there is any other way apart from using scheduling , control resource and conditions
A query
- philmalmaison
- Nouveau
- Posts: 1148
- Joined: 08 Jun 2007 12:00
- Location: Ile de France