Delay of 15 minutes in PS8 job

Post by catchtony » 04 Jun 2010 1:08

Hi, I have a requirement where I need to add a delay of 15 minutes between JOB A and JOB B. Both the jobs are PS8 jobs, I had tried using PRECMD in set tab of JOB B but it does'nt consider the delay as it is a PS8 job. Finally I have to add a UNIX jobs in between and added sleep 900 in the command line. Is there any better way where I don't need to add a job to make a delay ??

User avatar
Eight
Nouveau
Nouveau
Posts: 41
Joined: 03 May 2010 12:00

Post by Eight » 11 Jun 2010 7:45

Have you tried the %%POSTCMD in Job A (sleep command)?

hipikll

Post by hipikll » 12 Jun 2010 2:43

inally I have to add a UNIX jobs in between and added sleep 900 in the command line
Your way is the only (easy) way, if PRECMD or POSTCMD does not work (as you mentioned),
CTM does not have any 'add delay' feature :(.

User avatar
catchtony
Nouveau
Nouveau
Posts: 50
Joined: 12 Sep 2008 12:00
Contact:

Post by catchtony » 14 Jun 2010 7:20

I know I can add the POSTCMD in Job A...but the problem is that there are 100 of jobs ...so manually updating each job would be tedious. Anything else we can work around ?

Thanks for the replies.

hipikll

Post by hipikll » 14 Jun 2010 8:14

so export your jobs to flat file (xml) and edit the file. It should be fast. Then import them back.

If you're using 6.4. - you can do it by Mass Update.