Search found 13 matches

by Kayhman
01 Jun 2017 3:02
Forum: Job Definition
Topic: Job scheduling
Replies: 2
Views: 9583

Re: Job scheduling

Hi You can have the last thursday in the month using L1,L2....,L7 and thurdsay selected. The same for tuesday. But you must have an OR operator to explain who will be the last. In that case you don't have other solution to generate a specific calendar. Regards Sorry for the very late answer ;) I di...
by Kayhman
01 Jun 2017 2:56
Forum: Job Definition
Topic: Specific Scheduling Job
Replies: 1
Views: 21279

Specific Scheduling Job

Hello, I try to schedule a job who must run on the 25th of the month except if it's a non work day. My new day procedure begin at 12am and the job will be executed at 7am (next day after new day procedure) If the 25 is a sunday, the job must run on friday. If the 25 is an offday (like 05/25/2017), t...
by Kayhman
19 Aug 2016 2:42
Forum: Job Definition
Topic: Job scheduling
Replies: 2
Views: 9583

Job scheduling

Hello, I search a specific scheduling for a job. I don't know if it's possible without a dedicate calendar, but we don't want to manage calendar... Job A is scheduled every monday and wednesday and run the day after. Job B must run just after JOB A but only 1 day in the month. The last tuesday or th...
by Kayhman
03 Nov 2015 5:30
Forum: Job Definition
Topic: Schedule job on the last working day
Replies: 0
Views: 96051

Schedule job on the last working day

Hello, I need to schedule a ControlM 6.4 job who must execute at 5am (NDP is at 3pm) only on thursday and the last working day of the month. I have a calendar of working day, so I've scheduled it with L2 with calendar WORKINGDAY (Monday to friday). It's ok, but when the last working day is a Monday ...
by Kayhman
03 May 2011 6:02
Forum: Control-M Enterprise Manager
Topic: Gateway stay down after creation
Replies: 4
Views: 7611

hi walty,

It's ok. I've deleted the gateway and recreate it.

Thank you ;)
by Kayhman
29 Apr 2011 11:19
Forum: Control-M Enterprise Manager
Topic: Gateway stay down after creation
Replies: 4
Views: 7611

Hi Walty,

Thanks for your answer.
My EM run on a windows server.
All components are OK. There is 5 other gateway for datacenter.
Just this one stay down.
by Kayhman
28 Apr 2011 4:20
Forum: Control-M Enterprise Manager
Topic: Gateway stay down after creation
Replies: 4
Views: 7611

Gateway stay down after creation

Hello, I installed a new Control-M/Server in 6.2.01. When i defined the datacenter and create the gateway in admin facility, it stay in status DOWN. I check the ping between EM and Server, telnet => It's OK. Network team has confirmed me that there is no firewall between the 2 machines. How can i te...
by Kayhman
15 Mar 2011 11:56
Forum: Control-M Server
Topic: Migrate ControlM Server v224 to 6.2
Replies: 0
Views: 10639

Migrate ControlM Server v224 to 6.2

Hello, I restart a project we had stopped last year. We have a ControlM server v224 running on windows NT4 and DB Sybase. We'll install a new ControlM server v6.2 on windows 2003 and DB SQL 2000. The server is not build for now. I installed the migration toolkit to prepare the migration but when i s...
by Kayhman
26 Oct 2010 4:29
Forum: Job Definition
Topic: Copying scheduling tables/jobs from prod to preprod
Replies: 2
Views: 2495

Copying scheduling tables/jobs from prod to preprod

Bonjour, Nous devons migrer notre prod d'un vieux serveur DEC True64 vers un serveur virtuel windows 2003. Pour tester que tout est ok, nous allons tester tout le plan batch sur la recette. L'agent windows sera installé sur le serveur virtuel et il sera connecté au CTM de preprod. J'aimerais connait...
by Kayhman
19 Oct 2010 11:34
Forum: ChainView
Topic: Chainview 3.0
Replies: 7
Views: 30731

Hi It's true. so I modified the script without @@runcount not necessary for chainview. You can download the modified version ChainView 3.10 . It should run correctly. Hi, I don't know if I'm alone with this issue but the link doesn't work for me. I can't find the file to download and i'm redirected...
by Kayhman
22 Sep 2010 4:42
Forum: Exploitation / Operation
Topic: Job remain blue
Replies: 4
Views: 5686

Sorry, i forgot to give you an answer. I tried this but the ressource was not released. I tried another method: I forced the job in status running and forced to allocate the ressource to the job. And i killed the job. And it was ok. update CMR_AJF set STATE = '4', OSCOMPSTAT=0, STATUS='' where ORDER...
by Kayhman
26 Jul 2010 4:31
Forum: Exploitation / Operation
Topic: Job remain blue
Replies: 4
Views: 5686

Hi,

No, the job still stay in blue after placed on HOLD and released.

But thx for the answer ;)

And i have this issue only with 1 job.
Every jobs with Control Ressource runs correctly.
by Kayhman
19 Jul 2010 2:20
Forum: Exploitation / Operation
Topic: Job remain blue
Replies: 4
Views: 5686

Job remain blue

Bonjour, J'ai un probleme avec un job controlm qui reste en waiting control ressource alors que la ressource n'est pas utilisée. J'ai donc essayé de modifier les tables CMR_CTLUSE, CMR_CTL_J et CMR_CTLTAB sans succes. Quelqu'un peut il m'aider sachant que le ControlM est en version 2.2.4 sur un serv...