It is currently 19 Feb 2019 4:22


Post new topic  Reply to topic  [ 1 post ] 
Author Message
 Post subject: FDATE Utililty
PostPosted: 30 Jan 2019 7:59 
Offline
Nouveau
Nouveau

Joined: 27 Jan 2019 3:07
Posts: 6
Hi guys,

Can any of you enlighten me on a small issue i have with ctm jobs not ending correctly.

For example i have a job that calls a script using the fdate utlity, basically each day we have a ctm job that creates a folder with a date stamp for that day then a following job populates that folder with info.

Now the ctm job creates the folder correclty and populates it but the ctm job does not recognise that the job has finished so it just hang, therefore we never get to the of the batch strand!

The script works fine when not scheduled through ctm.

We have checked the error codes and they are correct

Any solutions would be gratefull!

_________________

Maximize The Usage Of The Scheduler



Top
   
Display posts from previous:  Sort by  
Post new topic  Reply to topic  [ 1 post ] 

All times are UTC+01:00


Who is online

Users browsing this forum: No registered users and 2 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
Powered by phpBB® Forum Software © phpBB Limited
The site created by Franck YOT. Images, logo, content and trademarks about Control-M products are property of BMC Software.
All the comments are property of their posters. Images, logo, content and design are © copyright by Scheduler-Usage.com. All Rights Reserved